Fort Collins, CO, USA Job ID: 8febe2e2-8fd8-4923-85c5-8ede0804b8d0 Job Tags: JB: Data Center Frontier, Company Type: Design / Build Firm, Discipline: Construction , Company Type: General Contractor / GC Firm, Discipline: Navy Nuke , Discipline: CXA / Commissioning , Construction, Commissioning / CXA, QA/QC, Mechanical Systems, Electrical, Project Manager, Testing, Navy Nuke , Power Systems, Critical Power, GC, Design /Build

Commissioning Project Manager Data Center Construction


Client Designation

Design / Build FirmGeneral Contractor / GC Firm

Disciplines

ConstructionCXA / CommissioningNavy Nuke

Commissioning Project Manager – Data Center Construction – Fort Collins CO 
This position is also available as a traveler in: Chicago IL, Chesterton IN, Indianapolis IN, Salt Lake City UT,  Dallas TX, Austin TX, Cedar Rapids IA, Hampton GA, Ashburn VA, Atlanta GA, Montgomery AL, Phoenix AZ, Reno NV, New Albany OH, or San Diego CA. Non-Traveling CxA PM roles are based in Charlotte NC, Austin TX and in Columbus OH

This opportunity is with an established General Contractor that specializes in converting existing Buildings and Structures into complex buildings / industrial complexes and is looking to expand its foothold even further into the Critical Facilities Market. Our client is taking their expertise and focus and applying it towards brownfield data center projects – which is the process for converting an existing building to a data center for the Hyperscale, Colo or Enterprise Marketplace. This company will provide a complete life cycle of solutions that will be custom-fit to the requirements of their client’s mission-critical facility. This opportunity provides a career-growth minded role with exciting projects with leading-edge technology and innovation as well as competitive salaries and benefits.

The CxA PM will establish, create and manage the overall commissioning process in the region, follow standards set by the organization and oversight of multiple cxa projects for large data center projects. This candidate will ensure that commissioning experts follow cxa standards, adhere to a thorough quality management / QC process and procedures that validate and document client’s systems. This candidate will also handle any technical commissioning issues in the region for local data center clients.

Responsibilities:

  • Manage multiple CxA Projects in the region as a Program Manager that consists of a full team of commissioning engineers and cxa project managers on a wide range of data center CxA projects
  • Manage project team by providing direction, monitoring effectiveness and providing leadership
  • Ability to manage a team of CxA Engineers and technical staff
  • Work closely with other functional areas of the organization, project contractors, internal / external team members, customers and suppliers
  • Oversee all phases of project management / project delivery: design, quality control, staffing, budget management (P & L) while following Industry Best Practices
  • Possess in-depth knowledge of Client, which are incorporated into overall project execution. Interface with clients to define project requirements. Establishes project work plan and deadlines.
  • Client Interface on projects; Manage client relationship / expectations with effective face to face, phone, and email communication
  • Ability to manage multiple projects; Champion design reports; Produce engineering proposals (RFPs); Facilitate client meetings / presentations that meet the project’s objectives
  • Track progress of projects against goals, objectives, timelines, and budgets
  • Generate reports, track project costs, financial forecasts as related to project status
  • Monitor expenses to ensure they fall within the prescribed budget
  • Understand / follow company policies and procedures
  • Will manage staff; candidate will be managing the technical aspect of projects and act as a technical resource for the local commissioning team
  • Ensure CxA standards are being followed for: Equipment pre-start-up and start-up procedures; Development of standard operating procedures (SOP’s) and Methods of Procedures (MOPs); Comprehensive Commissioning documentation
  • Ensure that the overall CxA process is being followed with the highest of standards:
    • Commissioning test procedures and reports
    • Commissioning logs, equipment checklist, and other tools to track commissioning projects
    • Comprehensive reports which include:
      • recommendations for optimizing building operations
      • functional checklists
      • list of deficiencies
      • equipment operation
      • maintenance manuals
  • Have the team follow Cxa Standards:
    • Review design criteria, specifications, drawings, equipment submittals, and other documentation pertinent to commissioning
    • Integrated system testing; Load Bank Testing; Compilation of all testing procedure results
    • Functional tests for various building MEP systems, such as: fire alarm and control systems, HVAC, Chillers, CRAC units, normal and standby electrical distribution systems, UPS, standby generators, and emergency lighting, etc.
    • System Assembly;
    • Commission plan preparation
    • Follow company QC process and procedures
  • Interface with clients, contractors, equipment vendors and owners agents as needed
  • Execute project assignments; Interface with project contractors, vendors, and testing technicians; Interact with all facets of the company: engineering, design, etc.
  • Verification of cxa results of test reports
  • Assist with field troubleshooting of commissioned equipment as needed; Field experience in the operation and application of Power Quality Analyzers, Power Disturbance Analyzers, Data loggers, and related system testing equipment

Qualifications:

  • Hands on experience managing Data Centers / Critical Facilities Projects with an A/E, MEP or CxA company
  • Previous Data Center / Mission Critical experience a must
  • 5 to 10 or more years of experience in the Electrical / Mechanical Commissioning Field
  • Experience with Level 1-5 commissioning
  • Experience managing cxa teams and developing plans for large scale commissioning projects
  • Experience with IEEE / ASHRAE procedures and protocols a plus
  • Possess basic knowledge of systems design for various projects
  • Bachelor’s Degree in Electrical / Mechanical Engineering a plus
  • P.E. license / LEED accreditation a plus
  • PMP certification a plus
  • Project management experience in the Consulting Engineering Industry
  • Client relationship / Client Management / Client Engagement / Business Development – creating RFPs
  • Excellent communication skills, both written and verbal (this role requires heavy amount of writing, documentation, and client interaction)
  • Strong organizational, communication, and reporting skills
  • Computer savvy / Microsoft Project, Excel. Ability to create complex reports, forecast modeling
  • Previous experience in the Military / Military veterans in all branches that have experience with Electrical / Mechanical is a huge plus (Navy Nukes- EMN, ETN, MMNs, Seabees, Army – Power Generation, Air Force – Power Production, Generator Techs, Maritime, Coast Guard, etc.)
  • Must be open to 25-50% Travel

Submittal Instructions:
Please apply directly by clicking the link below, alternatively you can forward your resume directly to: xpm58ts5ipn78jeckanko7yx1e@crelate.net

After applying, if you have further questions, you may call 973-895-5200 and ask for Iggy. You can also submit via our career portal and take a look at other Critical Facility openings we are working on at, https://www.pkaza.com/jobs/

If this job is not for you, feel free to forward this along. WE PAY FOR REFERRALS!!

Company offers competitive salaries and benefits package including medical insurance, a 401(k) plan
EOE/AA Employer M/F/D/V
Pkaza LLC is a third-party employment firm. All fees assessed by Pkaza LLC will be paid by our employer that we represent and not by the candidate

 

Max. file size: 100 MB.
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form

Similiar Opportunites

Chesterton, IN, USA

Electrical Controls Engineer

Electrical Controls Engineer - Chesterton, IN This opportunity is with an established General Contractor that specializes in ....

Client Designation

Design / Build FirmGeneral Contractor / GC Firm

Disciplines

Construction
Apply Online
Charlotte, NC, USA

QA / QC Manager – Data Center Facilities Operations (NON IT)

QA / QC Manager - Data Center Facilities Operations - Charlotte, NC Our client is an established Electrical Contracting ....

Client Designation

Commissioning FirmEnd UserGeneral Contractor / GC Firm

Disciplines

ConstructionCXA / CommissioningNavy Nuke
Apply Online
Ashburn, VA, USA

Critical Power Sales Associate

Critical Power Sales Associate - Ashburn, VA This job opportunity is with a Eastern Regional Market leader of Critical Power ....

Client Designation

3rd Party Firm

Disciplines

Navy NukeSales
Apply Online
Phoenix, AZ, USA

Load bank Technician Data Centers

Senior Load Bank Technician - Data Center Equipment Rental - Phoenix, AZ Our client is a fast growing company supporting miss ....

Client Designation

Commissioning FirmManaged Services Firm

Disciplines

CXA / CommissioningNavy NukeOperations and Maintenance (O/M)
Apply Online
Atlanta, GA, USA

Electrical CxA Non traveler

Electrical Commissioning Agent - Atlanta, GA (limited travel) This opportunity is with a leading EPC Company of data center d ....

Client Designation

Commissioning FirmDesign / Build FirmGeneral Contractor / GC Firm

Disciplines

ConstructionCXA / CommissioningNavy Nuke
Apply Online